Watch the video to learn more about the vision, partnership, and community impact behind the development of CarMax Park.
High-Performance Design
Sustainability and long-term resiliency were foundational to the project, reflected in the following strategies:
- Stormwater Management: Site grading was designed to effectively manage stormwater runoff and mitigate impacts from heavy rainfall.
- Regional Materials: Locally manufactured materials were prioritized to reduce transportation-related emissions.
- High-Efficiency Systems: Mechanical, electrical, and plumbing systems meet or exceed current standards.
- On-Site Renewable Energy: Solar photovoltaic systems help offset energy demand and reduce strain on the regional power grid.
- LEED-Aligned Design: While not pursuing formal LEED certification, the project incorporates efficient systems, low-flow fixtures, and durable, future-focused design.

CarMax Park: By the Numbers
- 450,000 square feet of total ballpark area, including the playing field and exterior spaces
- ~10,000 seat capacity
- 70,000–80,000 cubic yards of earth moved to shape the site
- 15,086 cubic yards of concrete placed
- 1,360 metric tons of steel supporting the venue
- 65,000 feet of piping installed
- 385 speakers and 160 TV displays enhancing the fan experience
- 240 toilets and 200 sinks supporting high-capacity events

Featured Press
CarMax Park has been featured extensively by local and national media outlets throughout the duration of the project.








Woodfin Yard (right field): inspired by the city’s front-porch culture
Rail Car Suites (left-center field): four open-air, semi-private suites that reinterpret Richmond’s railcar heritage in a way unique among minor league stadiums