Unique Elements
Site Challenges
The existing site conditions on this portion of the campus included poor drainage, a high groundwater table, and proximity to a floodplain which led to frequently unplayable conditions following significant rain events. The design of the new facilities raised the elevation of the field, allowing for stormwater management facilities to operate by gravity. To accomplish this, floodplain compensatory storage was designed and coordinated with the Town of Henrietta’s floodplain administrator.
Working closely with NYSDEC design guidelines, a phased Stormwater Pollution Prevention Plan (SWPPP) was also incorporated. Expanding the SWPPP disturbance limits and incorporating treatment and attenuation of storms in each phase has been a key success to the phased project approach.
All Electric
Judson Stadium is RIT’s first all-electric building, using an air-source heat pump system with multiple four-pipe air handling units featuring chilled water and heating hot water coils with energy/heat recovery, as well as zone controls with VAV boxes and electric reheat coils. The design reduces site energy intensity (EUI) by 40% and greenhouse gas emissions intensity by 50% compared to a baseline building.
Extensive Collaboration
Ongoing collaboration with an expansive group of RIT stakeholders including Facilities Management Services, Dining Services, Information Technology Services, Environmental Health & Safety, University Production Services, Marketing and Communications, University Advancement, University Arenas, Athletics, and University Senior Leadership was essential to the project’s success.
As Featured In
University Business Features “How to Upgrade Athletic Facilities Without Missing a Season”
In an article published by University Business, LaBella’s Higher Education Studio Manager Jerry DeRomanis, AIA, and Project Manager Jessica Kruse, AIA, draw on the Judson Stadium project to demonstrate how thoughtful planning and phased construction can help colleges and universities improve their athletic facilities while maintaining campus operations.
Read the Full Article Here
An Award-Winning Project
Judson Stadium Celebrated with Innovation Award from the CSI Rochester New York Chapter!
In May 2026, LaBella was honored to join Pike Construction Services in accepting the 2026 Innovation Award from the CSI Rochester New York Chapter for the Judson Stadium project at the 2026 Annual Awards Dinner held in Penfield, New York.
The CSI Rochester Awards highlight the role of exemplary communication in positively influencing the process, quality, and successful outcome of a project. The awards provide a platform for the architecture, engineering, and construction industry to showcase the work of our members in the construction process. The Innovation Award promotes innovative use of new materials or methods.

Featured Press
Additional coverage about Judson Stadium can be found in the following publications below.








Each locker room functions as a team room, featuring a kitchenette and central soft seating area. The lockers are highly customized, with programmable LED lighting at the toe kicks, fully vented units at the base, game day hooks, lockable storage, accent lighting for helmet display, and magnetic doors to display player graphics.